HUTTER FREI POWER GmbH


News to Thermal Power Stations

Thermal Power Stations EDELMAG Punta Arenas

Process Description:

  • The optimal process of Thermal Power Stations is investigated in the detailled study.
    The power stations would become in future the only electricity generating plants in the region.
    The optimal plant concept is one result of the power sequence planning as part of this study.
     

HUTTER FREI POWER Scope of Services:

  • Phase 1:
    Power Sequence Planning and Master Planning for the entire region over the next 20 years.
    Investigation about the mid-term and long-term availability of different fossil fuels with consideration of the fuel price forecast.
    Conceptual Engineering of different plant concepts

    Phase 2 (after decision for the preferred plant concept):
    For the decided preferred plant concept of a Combined Gas Turbine- and Steam Turbine Power Station, execution of a feasibility study.
     

Customer:

  • EDELMAG Gruppo CGE, Punta Arenas, Chile


Cookies information

We use cookies to optimally design our website for you (tracking cookies). Further information about cookies can be found in our data protection declaration. Technically necessary cookies are also set when you select “Reject”. By clicking “Accept” you agree to the use of all cookies.